This project has involved the progressive preparation of feasibility studies and infrastructure improvements/modification plans including a large replacement onsite wastewater treatment system (pressure mound septic system) to handle the facility’s current 2,500 GPD wastewater load. NYSDEC SPDES permitting was required and obtained. We are currently working with an Architect in expanding the medical practice to a new 35,000 SF facility on an adjacent parcel which will include site plan layout and design, design of green infrastructure stormwater management / SWPPP systems suitable for discharge into the NY 303(d) impaired Ballston Lake waterbody, onsite wastewater pressure mound treatment system, landscaping, grading, lighting and a looped access road and parking area suitable for approximately 300 vehicles. Tasks include regulatory assessments and determinations, local and State level permitting for site plan review, onsite wastewater treatment systems, stormwater management and wetland assessments (2012 – present).